Signed in as:
filler@godaddy.com
Us ambassadors hotels and penthouse suite for V.I.P's.
I first and seconded fixed the whole block from top to bottom on priced works with my gang of apprentices, subcontracted through E.M.F ltd and Haydens M and E, 2015.
I was awarded employee of the month on the Heathrow T3 L.V front of house panel upgrades, night shift, good team, good laughs and lots of back pain pulling the 40 odd year old switch panels apart.
Ive never seen so many nuts and bolts on a single floor before it was tretcherous and the poor old door frame came out too. :).
Targets missfits, E, Tom, Robbo, Nige, Les.
10MW Gassification plant feeding directly back into the grid at Rye Meads power station, epic job and the blind design and build of a never been done thing before,
rolled out everywhere now,
basically a big stream superheater, abit like a stream train.
Louis Vuitton shop fit out at Heathrow airport terminal 3 airside.